PM Surya Ghar Muft Bijli Yojana

Understanding the government subsidy program for residential rooftop solar installations.

Subsidy Details

1kW System

₹30,000

Central Subsidy

2kW System

₹60,000

Central Subsidy

3kW and Above

₹78,000

Central Subsidy (capped)

Eligibility & Requirements

Who Qualifies?

  • Residential property owners only
  • Individual homes, apartments, and housing societies
  • New constructions and existing buildings
  • Properties with suitable roof space and orientation

Note: Commercial, industrial, and rental properties are not eligible for this central subsidy.

Technical Requirements

  • Solar panels must be ALMM (Approved List of Models and Manufacturers) listed
  • Installer must be empaneled with DISCOM or state nodal agency
  • System must include net metering arrangement
  • Performance monitoring capabilities required

Application Timeline

Process Steps

  1. Initial consultation and site assessment
  2. System design and proposal
  3. Subsidy application submission
  4. Installation and commissioning
  5. Inspection and net metering setup
  6. Subsidy disbursement

Time Estimates

Feasibility & Design: 15 days
Installation: 30-45 days
Net Metering: 30 days
Subsidy Processing: 30 days
Total Estimated Time: 120 days

Financing Options

Upfront Purchase

Make your investment in the future

No monthly payments, own your system outright, and enjoy all the savings and incentives.

Solar Loans

Finance your system with low-interest loans specifically designed for solar installations.

Monthly payments are often lower than your electricity bill savings.

Cost Savings Example

Typical 5kW Residential System

Costs

  • System cost (5kW @ ₹55,000/kW): ₹2,75,000
  • Less: Central subsidy (3kW+): -₹78,000
  • Net cost after subsidy: ₹1,97,000

Annual Benefits

  • Electricity savings (~₹4,650/month): ~₹55,800
  • Estimated annual maintenance: -₹2,000
  • Net annual benefit: ~₹53,800

Estimated payback period: ~3.7 years